There are currently 11 types of bridges that can be built in CXL2012. Some are relatively cheap whilst other are very expensive to build and maintain.
When using the bridge tool you can alter the height by holding SHIFT Key while moving your mouse up or down. To build a tunnel move the mouse downward until you see the tunnel option display.
Small Road Bridge
Cost | Expensive | ![]() |
---|---|---|
Maintenance Cost | 10c | |
Max. Flow Cars/Minute | 20 |
Road Metal Bridge
Cost | Very Expensive | ![]() |
---|---|---|
Maintenance Cost | 20 c | |
Max. Flow Cars/Minute | 40 |
Road Bridge
Cost | Very Expensive | ![]() |
---|---|---|
Maintenance Cost | 20 c | |
Max. Flow Cars/Minute | 40 |
Simple Grassy Road Bridge
Cost | Very Expensive | ![]() |
---|---|---|
Maintenance Cost | 40 c | |
Max. Flow Cars/Minute | 40 |
Small Avenue Bridge
Cost | Very Expensive | ![]() |
---|---|---|
Maintenance Cost | 40 c | |
Max. Flow Cars/Minute | 60 |
Large Uptown Avenue Bridge
Cost | Colossal | ![]() |
---|---|---|
Maintenance Cost | 80 c | |
Max. Flow Cars/Minute | 80 |
Large Avenue Bridge
Cost | Colossal | ![]() |
---|---|---|
Maintenance Cost | 80 c | |
Max. Flow Cars/Minute | 80 |
Large Avenue Metal Bridge
Cost | Colossal | ![]() |
---|---|---|
Maintenance Cost | 130 c | |
Max. Flow Cars/Minute | 80 |
Wide Uptown Avenue Bridge
Cost | 5200 | ![]() |
---|---|---|
Maintenance Cost | 50 c | |
Max. Flow Cars/Minute | 80 |
Expressway Bridge
Cost | Colossal | ![]() |
---|---|---|
Maintenance Cost | 175 c | |
Max. Flow Cars/Minute | 160 |
Highway Bridge
This bridge must be connected to end of a Highway Road. Seems it will not connect to the side of a road.
Cost | Very Expensive | ![]() |
---|---|---|
Maintenance Cost | 50 c | |
Max. Flow Cars/Minute | 320 |